Showing posts with label Kelowna Accord formula. Show all posts
Showing posts with label Kelowna Accord formula. Show all posts

Thursday, September 25, 2008

Kelowna Accord and other INAC externality formula

http://www.ainc-inac.gc.ca/pr/est/rpp08-09/08-09_INAC_planned_e.html
From this budget's 2007-08 forecast spending, tacking on the 2008-09 $138M water/wastewater expenditure, an INAC annual budget of $7.3746B is attained. The externalities in this budget can be used as a guide to estimating the externailities of expenditures such as Kelowna Accord.

I've previously costed these externaltiies line-by-line, but have lost the record. The total positive externalities of the INAC budget came to just under 14%. So I'll use 14% as my externality multiplier baseline for INAC spending increases such as Kelowna Accord, and reaccount the INAC budget if I have time.